The cedar siding was completed today and the flashing on top of the cedar was almost completed. The Hardi siding is going up, its about 20% done. Inside, the furnace and hot water heater are in and we have water and a sewer connection. All sink faucets are in and working. The plumber has about two more days of work and he'll be done. The electrician has been installing outlets and switches. I finished the cabinet toe-kicks yesterday and made a lot of progress on the drawer pulls today. Noah and Les stopped by with out current neighbors the Sudworths today. It was a nice break for me from the work. Its been a lot, but I am enjoying it. I feel priviledged and blessed to be able to do it.
Thursday, May 7, 2009
Cedar Siding Finished
The cedar siding was completed today and the flashing on top of the cedar was almost completed. The Hardi siding is going up, its about 20% done. Inside, the furnace and hot water heater are in and we have water and a sewer connection. All sink faucets are in and working. The plumber has about two more days of work and he'll be done. The electrician has been installing outlets and switches. I finished the cabinet toe-kicks yesterday and made a lot of progress on the drawer pulls today. Noah and Les stopped by with out current neighbors the Sudworths today. It was a nice break for me from the work. Its been a lot, but I am enjoying it. I feel priviledged and blessed to be able to do it.
Monday, May 4, 2009
Kitchen Cabs Part 3, Countertops, and Cedar Siding
Noah loves his new tool - the level.
Here is the range hood surrounded by some custom milled side panels - done by the professional (Grandpa Bob)
This is the guest bath in the basement.
This is Noah's and Baby #2's bathroom.
'The powder room's funky little vanity.
The cedar siding started to go up on Friday and should be done some time this week. It wraps around the side of the house to the back and is looking pretty sharp.