Nothing too obvious happened this week. The conduit for our power, cable, and phone went in the ground from our back power pole to the house (as seen above.) The under ground plumbing was installed, including the pipes for the basement bathroom, the sump pump and ejector pit. Lastly, the lot was backfilled. This coming week is a big one with framing set to start Monday.
Sunday, November 2, 2008
Back Filled
Nothing too obvious happened this week. The conduit for our power, cable, and phone went in the ground from our back power pole to the house (as seen above.) The under ground plumbing was installed, including the pipes for the basement bathroom, the sump pump and ejector pit. Lastly, the lot was backfilled. This coming week is a big one with framing set to start Monday.