The cedar siding was completed today and the flashing on top of the cedar was almost completed. The Hardi siding is going up, its about 20% done. Inside, the furnace and hot water heater are in and we have water and a sewer connection. All sink faucets are in and working. The plumber has about two more days of work and he'll be done. The electrician has been installing outlets and switches. I finished the cabinet toe-kicks yesterday and made a lot of progress on the drawer pulls today. Noah and Les stopped by with out current neighbors the Sudworths today. It was a nice break for me from the work. Its been a lot, but I am enjoying it. I feel priviledged and blessed to be able to do it.
Thursday, May 7, 2009
Cedar Siding Finished
The cedar siding was completed today and the flashing on top of the cedar was almost completed. The Hardi siding is going up, its about 20% done. Inside, the furnace and hot water heater are in and we have water and a sewer connection. All sink faucets are in and working. The plumber has about two more days of work and he'll be done. The electrician has been installing outlets and switches. I finished the cabinet toe-kicks yesterday and made a lot of progress on the drawer pulls today. Noah and Les stopped by with out current neighbors the Sudworths today. It was a nice break for me from the work. Its been a lot, but I am enjoying it. I feel priviledged and blessed to be able to do it.
Subscribe to:
Post Comments (Atom)
1 comment:
The house is looking beautiful! Things look like they're really coming together and all of your hard work and long hours are paying off! Congrats :-) Can't wait to see you guys!
Post a Comment